Roofing Contractor in Asheville, NC

Shingle and metal roof replacement across Western NC. Full tear-off, ice and water at the vulnerable spots, ventilation that works.

Roof replacement typically runs $9,000 to $30,000 for shingle, more for metal. Free inspection.

Roofs fail at the details, not in the field

The middle of a roof rarely leaks. Water gets in at valleys, chimneys, skylights, pipe boots and where a roof meets a wall. Those are the places a fast crew skips – reusing an old boot, running shingles into a valley without proper metal, caulking a chimney instead of stepping and counter-flashing it. On steep mountain roofs with heavy summer rain, those shortcuts show up quickly.

We roof our own new homes and we replace roofs the same way: full tear-off so we can see the deck, ice and water membrane at eaves, valleys and penetrations, new flashing rather than reused, and intake and exhaust ventilation actually balanced so the attic dries.

What we install

  • Architectural asphalt shingles. The standard here – GAF, Owens Corning and CertainTeed systems with manufacturer warranty coverage.
  • Standing seam metal. Longest service life, sheds snow and debris, the right answer on steep pitches and on homes where the roof is a design element.
  • Metal shingle and exposed fastener panels. Lower cost metal options for outbuildings and budget-conscious replacements.
  • Low-slope sections. Membrane roofing where a porch or addition drops below shingle-rated pitch.
  • Repairs and storm damage. Leak diagnosis, flashing repair, and documentation for insurance claims after wind or hail.

Tear-off, not layover

Adding a second layer of shingles over an old roof is cheaper and we do not do it. You cannot inspect or replace bad decking under a layover, the new shingles run hotter and fail early, and the second layer complicates every future repair. Tear-off lets us see and fix rot at the eaves – which we find on a meaningful share of the older Asheville homes we work on.

Timeline and budget

Most shingle roof replacements are one to three days on site. Metal takes longer. Shingle replacement generally runs $9,000 to $30,000 depending on square footage, pitch, layers to remove and how complex the roofline is. Standing seam metal typically runs two to three times the shingle price and lasts several times as long.

Where we work

Asheville, Hendersonville, Arden, Candler, Fletcher, Weaverville, Black Mountain, Mills River, Brevard and Waynesville.

How the project runs

  1. 01

    Inspection

    We get on the roof, check the field, flashings, penetrations and attic ventilation, and photograph what we find.

  2. 02

    Written estimate

    Material system, flashing scope, ventilation and a stated allowance for decking replacement.

  3. 03

    Schedule

    Weather-dependent scheduling with a firm start window and materials delivered ahead.

  4. 04

    Install

    Full tear-off, deck inspection and repair, underlayment and ice barrier, flashing, roofing, ridge ventilation.

  5. 05

    Cleanup and warranty

    Magnetic sweep of the property, final walk, two-year workmanship warranty plus manufacturer coverage.

Why homeowners choose Big Hills

  • Licensed NC general contractorBuilding in Western North Carolina since 2018, 130+ homes delivered.
  • One crew, start to finishIn-house carpenters and site supervisor instead of a chain of subs you never meet.
  • Fixed written scopeYou approve selections and the number before demo day, so the budget holds.
  • 2-year workmanship warrantyThe same warranty we put behind the homes we build from the ground up.

Frequently asked questions

What does a new roof cost in Asheville?

Shingle replacement generally runs $9,000 to $30,000 depending on size, pitch and roof complexity. Standing seam metal typically costs two to three times that and lasts far longer.

How long does a roof replacement take?

One to three days for most shingle roofs. Metal roofs and complex rooflines take longer. We schedule around weather and stage materials ahead of the crew.

Can you go over the existing shingles?

We do not. A layover hides rotted decking, shortens the life of the new shingles and complicates every future repair. Every job is a full tear-off.

Should I go metal?

If you plan to stay in the house long term, metal usually wins on lifetime cost and handles our weather well. If you are selling within a few years, architectural shingles are the sensible spend.

Do you handle insurance claims after storm damage?

We inspect, document the damage with photographs and provide a detailed scope your adjuster can work from. We do not negotiate the claim for you, but we make sure nothing gets missed in the scope.

How do I know if I need a roof or just a repair?

Age, granule loss, cracked or curling shingles and failed flashings tell the story. If the field is sound and one detail is leaking, we repair it - we will say so rather than sell you a roof you do not need yet.

Get a free in-home estimate

Tell us about the project. We walk the space, talk through scope and materials, and send a written estimate — no charge, no pressure.

(828) 617-9101 renovations@bighills.com